George Bush Intercontinental Airport (IAH)

Overview

  • Assure-ITTM Quality Management System
  • Owner: George Bush Intercontinental Airport (IAH)
  • Project Name: HAS Project 651
  • Project Cost: $70 Million

Project Description

ATSER was selected to provide quality management services for the $70 million replacement and improvement project. Work included rehabilitation of the runway with the following pavement sections.

  • 17.5" Concrete
  • 6.0" Cement treated base
  • 22" Recycled concrete base
  • 8.0" Lime flyash treated subgrade
  • 6.0" Lime stabilized subgrade

ATSER's services included providing engineering oversight for the workmanship and materials used on the project. ATSER also made use of out Assure-IT Quality Management System to record, calculate and report in real time contract compliance,