You Got The Right Design Drawing?

Every Project is inundated with drawing changes through the manufacturing and construction process. The NDCC notification of design change, is a cumbersome and inefficient manual and/or semi-manual process. The drawing changes create an updated version of the original. Problems arise about if the crew is building to the correct drawing or, which portion of the ODD (Original Design Drawing) will be unaffected by the new version, thereby allowing progression on unaffected areas. Building on wrong drawings are costly errors.

JoomShaper