Advanced | Technology | Science | Engineering | Research       Home  |   Careers  |  Contact Us
ATSER - Advanced ATSER - Technology ATSER - Science ATSER - Engineering ATSER - Research Reliant Stadium project Houston, TX via Harris County Sports Authority; ATSER Solutions software was successfully used in the design and construction phases. Tacoma Narrows Bridge project Tacoma, WA via the Washington Department of Transportation; ATSER Solutions software was successfully utilized. Interstate 15 Corridor Reconstruction project Salt Lake City, UT via the Utah Department of Transportation; ATSER Solutions software was successfully utilized. Transportation Expansion Project (T-REX) Denver, CO via the Colorado Department of Transportation; ATSER Solutions software was successfully utilized. Reliant Center project in Houston, TX via the Harris County Sports Authority; ATSER Solutions software was successfully utilized. The Port of Houston expansion project in Houston, TX via the Port of Houston Authority; ATSER Solutions software was successfully utilized. Mosaic Towers project Houston, Texas via Phillips Development & Realty; ATSER software was successfully utilized.
About | Signature Projects | Products | Solutions | Industries | Support

Manage-IT™ Implementation for Public Infrastructure Division

Client: Harris County PID

Project Value: $2B Annual CIP

Products: Track-IT™, Construct-IT™, Assure-IT™

Key Facts 

  • Road, Bridges, Water and Sewer, etc.
  • 1000 Users



 

 

 

 

 

 

 

 


Manage-IT™ Implementation for Public Infrastructure Division Solution Graph

ATSER provided software to the county enabling them to monitor real-time project status, maintain more accurate record, allow project participants to effectively communicate and collaborate, access relevant project content in a secure environment and save the county money.  The Construct-IT™ CPM system uses an Oracle open architecture database for storage of project information.  Information from this database is used to generate detailed reports for use by Harris County engineers, project managers, and project directors, and upper management. Its data can also be combined with the existing Harris County IFAS database system to provide even more comprehensive reports. Construct-IT™ can also perform detailed estimate tracking of project timelines and documentation of cost, schedule, quality and contract administration information for all engineering and construction projects.

Project information can be accessed through several methods, including an advanced search engine, through global and segregated pull down menus, and through an easy to use Graphical Information System (GIS) interface.  Once an agreement or contract has been selected, the user can enter, recall, and report on almost every aspect of an engineering or construction project. Other system capabilities include the importation of field data through PDAs and Tablet PCs, and the ability to generate and track change orders by contract.

The Track-IT™ Document Control System is used to store and categorize all information associated with any of Harris County Capital Projects.  When a new Contract is opened within the Construct-IT™ module, Track-IT™ will automatically create a file folder structure that will be used to archive documents as they are created.  The administrators, engineers, or project managers/directors can customize the archival of information by creatng additional folders and sub-folders.

ATSER provided customization per Harris County requirements and systems integration support to configure business logic and workflow requirements to meet their particular needs. The web-based technology includes Internet security controlled by individual login/passwords that define roles, responsibilities, viewing, editing, and access rights.  ATSER assisted with configuring Harris County servers to accept our software and opening of firewall ports and router configuration.

 


Legal Disclaimer | Privacy Policy | Sitemap | © 2009 ATSER