Advanced | Technology | Science | Engineering | Research       Home  |   Careers  |  Contact Us
ATSER - Advanced ATSER - Technology ATSER - Science ATSER - Engineering ATSER - Research Reliant Stadium project Houston, TX via Harris County Sports Authority; ATSER Solutions software was successfully used in the design and construction phases. Tacoma Narrows Bridge project Tacoma, WA via the Washington Department of Transportation; ATSER Solutions software was successfully utilized. Interstate 15 Corridor Reconstruction project Salt Lake City, UT via the Utah Department of Transportation; ATSER Solutions software was successfully utilized. Transportation Expansion Project (T-REX) Denver, CO via the Colorado Department of Transportation; ATSER Solutions software was successfully utilized. Reliant Center project in Houston, TX via the Harris County Sports Authority; ATSER Solutions software was successfully utilized. The Port of Houston expansion project in Houston, TX via the Port of Houston Authority; ATSER Solutions software was successfully utilized. Mosaic Towers project Houston, Texas via Phillips Development & Realty; ATSER software was successfully utilized.
About | Signature Projects | Products | Solutions | Industries | Support
>> Product Overview

Benefits of Place-IT™

 

 

 

 

 

 

Product Benefits

  • Reduce Paving Cost by balancing the four different rates of plant production, hauling, material placement and compaction.
  • Enhance Tacking of the paving process with process simulation of current production, hauling and compaction rates.
  • Minimize Truck Hauling time through simulation of current and expected future rates of placement and compaction.
  • Enable Continuous Paving capability of the paver to operate without disruption in the orderly progress of work.
  • Minimize the Number of Rollers needed to achieve the required degree of compaction.
  • Shorten Reporting Time with standardized reports.

Legal Disclaimer | Privacy Policy | Sitemap | © 2009 ATSER